Project: Project: Failure of Existing Cooling Equipment
Solution: Provide Temporary Cooling System.
Refinery customer had a failure of existing cooling equipment in its administration building. An important meeting was scheduled to take place in the building the next day. Carrier Rental Systems (CRS) brought in a 100 ton chiller, air handler, pump, generator and duct. The equipment was installed the night before the meeting and started up at 1:00 am.
The building was cool when the meeting began the next day.
![]() |
![]() |