Project: High School Replaces Boilers
Solution: Temporary Heating System Using Hot Water Boilers.
A planned project to replace an existing high school boiler was postponed for several extenuating circumstances. The original goal was to begin and end the project during the summer break. Due to the delays, the three month project began mid-November, and the school needed an immediate solution for temporary heating.
![]() |
![]() |
Carrier Rental Systems (CRS) was called in to design the temporary system for the school.
Working closely with the plumbing and general contractors, CRS designed an economical solution
to the problem. The set-up for the temporary system took less than 24 hours.
Temporary Equipment:
- Three 200HP hot water boilers
- One Distribution Manifold
- One Electrical Distribution panel
- One 480/208 transformer
- One 2000 Gallon Fuel Tank