Project: High-rise office building replaces existing mechanical utilities
Solution: HVAC designed a high pressure portable system for heating and cooling.
Portable equipment System:
- High pressure Plate and Frame Heat Exchanger
- 250 Hp Steam Boiler
- 800 Tons Air Cooled Refrigeration
- Additional Supplemental Generator For "Back-Up" Power


![]() |
![]() |

