Comfort Cooling For Factory Assembly Line


Project: Temporary Comfort Cooling System for Assembly Line Workers

Solution: HVAC designed a portable system that provided the required cooling during the summer months.

To help offset worker fatigue and relieve the burden of a hot working environment, a large assembly factory needed instant relief. The factory decided to install a permanent system, but due to the size of the facility and the intense summer heat, a portable system was installed until the permanent system was up and running. To help keep costs down, the portable system was designed to only cool the working area of the assembly line rather than the entire facility. Production rose to its highest levels in recent years.

Portable equipment System:
- 660 Tons of Air Conditioning
- 7800' of "flex" and "lay flat" duct work
- Power: 13600v of Utility power. CRS supplied a high voltage transformer to reduce the voltage to 480v.


Portable AC system installed
System designed to cool limited area
Temporary cooling system helps keep cost down


flex and lay flat duct work used
Temporary HVAC cooling system is successful