Project: Temporary, central chilled/ hot water/ humidity control during building renovations.
Solution: Provide hot and chilled water to portable air handlers in addition to providing numerous 20 ton air conditioners (with heat strips) for localized control.
Application:
The end-user was facilitating a fast-track building retrofit for its research and development operation.
The building, along with its mechanical systems, would be renovated to meet the needs of its
requirements.
The accelerated project schedule was hindered by lengthy lead times in the design, sourcing, and installation
of the building's base mechanical systems. Such delays would affect the customer's development schedules and
ultimately its `time to market'.
The project's mechanical contractor was asked to implement construction plans that would enable the end-user
to effectively utilize its' buildings during the renovation. CRS responded by designing an application that
not only met the technical requirements of the project, but also provided immediate mobilization of the
required equipment.
Equipment:
* 325 tons of cooling capacity including chillers, chilled water coils, pumps, hose
* 7.71 MBH heating capacity w/ humidification including boilers, humidifiers, heating coils, pumps,
hose, expansion tanks and fuel tanks
* 220,000 CFM of air handling equipment
* 60 tons of air conditioning equipment
* Water and electrical distribution