Temporary Cooling Tower System While Existing Tower Receives Maintenance


Project: Temporary 2,000 Ton Cooling Tower System

Solution: Create portable cooling tower system by utilizing a gravity feed system.

CRS installed a standby system of 2000 tons in case of a failure with the customers existing tower system.

The towers supplied by CRS had to be installed at an elevation higher than the existing cooling tower system to facilitate a gravity feed from the temporary tower to the permanent tower water system.

CRS used steel pipe with victaulic fittings to put the system together.


Temporary Cooling Tower
Portable Cooling Tower System Installed
Temporary Cooling During Maintenance